Event Name: | Namma Metro Inspection Drive |
Event Date : 22nd September 2017 |
Event Details: | Bangalore Development minister KJ George with BMRCL Pradeep Singh Kharola, managing director, Bengaluru Metro Rail Corporation Limited (BMRCL) inspecting the ongoing construction of metro stations, in a major relief to the residents along the Kanakapura Road in south Bengaluru, namma metro Reach 4B extension (Yelachenahalli to Anjanapura Township Station) will be operational by the end of next year, in Bengaluru on Friday 22nd September 2017 |
|